STARC-121620

Description

Putting Contract Cargo in a Stor*All Box Forfeits Cargo

Env+Build#

None

Priority

Priority: MediumMedium

was chosen MAIN

None

QA/Dev Status

None

Staff Comments

None

Reproduction Steps

------------------
1) Accept "Hauling" contract
2) Purchase Stor*All box from cargo services
3) At the freight elevator, place Contracted cargo into a big enough Stor*All box
4) Load Stor*All box into ship
5) Deliver cargo to contract destination
6) Unload cargo into freight elevator
7) Use the freight elevator terminal to remove contracted cargo from Stor*All Box, into location inventory

What happened
-------------
The contracted cargo does not complete the contract mission. Pressing "Submit" on the mission in the Mobiglas fails the mission as well.

What should have happened
-------------------------
Contracted cargo should retain its "contracted" status no matter how it's loaded onto the ship as long as it is still within mission parameters. Bringing cargo to destination should complete the mission successfully.

Workaround
----------
No. To perform the missions, you cannot use Stor*All boxes for the cargo deliveries.

Reported fixed with

None

declared duplicates

None

Activity