Washington Crossing building connect

Description

There is a need for internet connectivity at a new office for the maintenance supervisor at Washington Crossing. Point to Point seems like a good option, see attached photo. Maintenance Supervisor Ken Lunden tried to pull a network cable through conduit between the two buildings but was unsuccessful.

Need to access options for internet connectivity at this new maintenance supervisor office.

Project Justification

None

Attachments

Linked work items

Activity

Ben.Trotter 13 December 2023, 16:27

Dave Leitinger is able to complete the network connection installation on 12/12/23. He provided this update

From: Leitinger, Dave [DEP] <Dave.Leitinger@dep.nj.gov>
Sent: Wednesday, December 13, 2023 11:22 AM
To: Luk, Jonathan [DEP] <Jonathan.Luk@dep.nj.gov>; Trotter, Ben [DEP] <Ben.Trotter@dep.nj.gov>
Cc: LaPolla, Brian [DEP] <Brian.LaPolla@dep.nj.gov>
Subject: Re: Washington Crossing Maintenance Office P2P request

 

Johathan,

 

I was out at the Washington Crossing maintenance shop yesterday.  Everthing is setup and working I left a cable taped to desk in the out building active and ready for use.

I had to make a change on the router and turns out it was 15 years old and nobody had access. After a few hours on phone with Comcast they wanted to replace it. I didn't want to wait for that so I replaced it with our gear so I had comcast remove the $20 per month router rental fee. So you should see bill for that location reduced by $20 per month.

Any issues please let me know.

 

Thanks

  • v/r Dave

  • 609-218-2621

Ben.Trotter 16 October 2023, 15:47

Site visit on 10/11/23 with Dave Leitinger and Brian LaPolla. Determine that Point to Point would be best solution. Ran network cable in Maintenance Garage where Comcast modem is currently, through attic to far corner of building where an antennna can be mounted that points to the newly renovated Supervisor office (1 room former storage building). Network cable was also run in attic of renovated office. Cable ends were terminated.

Will need to schedule another visit to complete setup of remaining equipment.