Modernize NJEMS Testing Issue Tracker

Description

DOIT will undertake the modernization of the legacy Issue Tracker application used across projects to manage and track issues during project sprint reviews. The effort will focus on developing a proof of concept (POC), replicating the existing functionality of the current tracker while leveraging the capabilities of the modernized NJEMS platform.


CGI will do a one day JAD with DOIT to discuss needs and transition plan from Issue Tracker to the new tool (possibly Pega Application). As part of this initiative, CGI will also produce a detailed design memorandum documenting the proposed solution architecture, system design, and integration approach for implementing the issue tracker within NJEMS. The POC and design memo will collectively demonstrate the feasibility of transitioning from the legacy application to a scalable, modern solution that improves issue tracking, enhances collaboration, and provides greater visibility for project teams.

Problem Statement

The present NJEMS Testing Issue Tracker was built in PowerBuilder. It needs to be modernized to Pega or other platform to remain useable for all NJEMS testing events.

Project Justification

This Issue Tracker is used for all NJEMS/RSP/NODE/OPRATS UATs. It was bult in PowerBuilder which is no longer supported by DOIT. The tracker need to remain active and viable for continued use, and therefore needs to be modernized.

Estimated Transactions

None

Target Rollout Date

30 October 2026

Target Rollout Date Reason

Work Plan 220 has JAD/Design and POC out through end of July 2026.

Attachments

Upload attachments

Drop your files to upload

(Max file size: 1.00 GiB)

Uploading...
(Template) Current File Name (1 / 7) 123KB / 2.1MB
(Template) File Name 123KB / 2.1MB
Upload completed. Click here to reload the page.

Activity