TCKT128-Ligne B2-IBUPRO200

Description

A temperature drift on a critical circuit was reported by the automation system.
After the alert was confirmed, maintenance scheduled an intervention within 24 hours.
A temporary manual adjustment was applied to minimize the impact.
The Quality team is monitoring the affected lot to prevent premature release.