Integrate to BigQuery the data model description and the fields' description and label
Description
PRDE - Story default text according to the team DoR (Definition of Ready)
03 - GOAL (DESCRIBE THE PROPOSED SOLUTION):
Integrate with BigQuery the following meta-data from Data Model record from Carol:
- Data Model’s description.
- Data Model’s label.
- Data Model field’s description.
- Data Model field’s label.
This will allow us to share the catalog we have available in BigQuery.
06 - ACCEPTANCE CRITERIA:
Integrate with BigQuery the following meta-data from Data Model record from Carol:
- Data Model’s description.
- Data Model’s label.
- Data Model field’s description.
- Data Model field’s label.
Ps.: We should not run the process to generate the avro schema or update data models on BQ. It will be performed as needed by users.
Activity
Show:
This issue was automatically transitioned to REGRESSION, as its PR was just merged into qa branch in Github.
This issue was automatically transitioned to REGRESSION, as its PR was just merged into qa branch in Github.
This issue was automatically transitioned to TESTED & MERGED, as its PR was just merged into develop branch in Github. PR Approved by Damore.
This issue was automatically transitioned to QA REVIEW, as its PR was just approved in Github.
Github user Damore has just commited and issue was sent back to the REVIEW column.
@Robson Thanael Poffo ,
@Glaucio Scheibel , @Douglas Coimbra Lopes , @Gabriel DAmore Marciano
Flag was removed since you have just transitioned the issue status/column.
Github user Damore has just commited and issue was sent back to the REVIEW column.
This issue was automatically transitioned to QA REVIEW, as its PR was just approved in Github.
@Robson Thanael Poffo ,
@Geny Isam Hamud Herrera , @Glaucio Scheibel , @Douglas Coimbra Lopes , @Gabriel DAmore Marciano
This issue was planned to be delivered until 2024-01-22. You can check that by consulting the issue in the Due Date field.
Dates already planned for this issue: 2024-01-22, 2023-12-11, 2024-01-02
If External Issue Link field is filled, customer was also informed on JIRA TOTVS.
Because of end of year (vacations + reduced capacity + final tests of OKRs) this card will not be deployed until next semester.
@Douglas Coimbra Lopes This card is flagged waiting my C.R.
@Glaucio Scheibel Card validated by the QA team. It is pending only the code review.
cc @Gabriel DAmore Marciano
LABEL/DESCRIPTION 1
@Robson Thanael Poffo ,
@Pedro Buzzi , @Glaucio Scheibel , @Douglas Coimbra Lopes , @Gabriel DAmore Marciano
This issue was planned to be delivered until 2024-01-01. You can check that by consulting the issue in the Due Date field.
Dates already planned for this issue: 2023-12-11, 2024-01-01
If External Issue Link field is filled, customer was also informed on JIRA TOTVS.
:fine2: Scenario encontrado no
• Atualizei a label/description do datamodel, porem na ingestion, o valor de description nao foi atualizado + nao ha a coluna Label.
• Detalhes/Evidencias no card
• :white_check_mark: Update: topico resolvido: card do data irah trabalhar na parte do BQ
Edited on Slack - platform-config - Douglas Coimbra Lopes
:fine2: Scenario encontrado no
• Atualizei a label/description do datamodel, porem na ingestion, o valor de description nao foi atualizado + nao ha a coluna Label.
• Detalhes/Evidencias no card
Edited on Slack - platform-config - Douglas Coimbra Lopes
Scenario encontrado no
• Atualizei a label/description do datamodel, porem na ingestion, o valor de description nao foi atualizado + nao ha a coluna Label.
• Detalhes/Evidencias no card
Sent by Slack - platform-config - Douglas Coimbra Lopes
This issue was automatically transitioned to REVIEW, as its PR (not DRAFT and not WIP) was just created in Github.
feat: Integrate to BigQuery the data model description and the fields description and label
Vamos enviar o language padrão que usamos hoje: `en-US`
Sent by Slack - pm-backend - Robson Poffo
Refinement:
@Robson Thanael Poffo ,
@Gabriel DAmore Marciano ,
@Geny Isam Hamud Herrera ,
This issue was planned to be delivered until 2023-12-11. You can check that by consulting the issue in the Due Date field.
Dates already planned for this issue: 2023-12-11
If External Issue Link field is filled, customer was also informed on JIRA TOTVS.